Start Date: 2/15/18 Completion Date:12/31/18 History: 1909 Masonry/wood depot building approx 2000 sqft Location: 120 E 5th St Details/Facts/Goals: Historic Restoration of East Side Train Depot and Event Space. We were able to review plans from the same train depot that was built in Ames (later...
Start Date: 1/1/22 Completion Date: 6/1/22 Location: 112 SE 4th St.-Brewery Details/Facts/Goals: Relocate Twisted Vine Brewery from West Des Moines to downtown East Village and have them open for summer Sq/ft- Units: ~7,000 Process/Techniques: We tore down all the old brewery equipment, move and...
Start Date: 1/1/2022 Completion Date: 7/1/2022 History: TI build out for Barrel House Restaurant Location: 401 E Court Ste 300 Details/Facts/Goals:Barrel House has started to franchise, and the Des Moines location is the first location outside of their home territory in Eastern Iowa. Sq/ft- Units:...
Location 2801,2807,2815 Grand Ave Details/Facts/Goals 3 buildings, Historic Restoration. 395 windows. 2815 has decorative historic mosaic tile in common hallway. Built by J.P. Condon. Sq/ft- Units 47 units, Community room, Dog park and Parking lot. 13 studios and 34 one bedrooms Process/Techniques...
Sq/ft- Units: 1,700 sq/ft While simultaneously working at Quninton’s Bar and Deli, we separated the existing sports bar and restaurant to create additional space for this brand-new cocktail lounge, Alleged Lee’s! At this historical East Village location we moved a 100-year bar from...